COUNCIL PROJECT RECORD

Specific Engineering Design for the remediation of the existing bridge, which includes reinstatement of pile diagonal bracing, repla cement of wing walls walls, new timber blocking between existing br

Consent BCO10418102

Lead age

17 days

Building consent issued · · as at

Estimated project value

NZ$130,000

Source-reported consent estimate; not verified total project value, remaining spend or available contract.. This estimate is not an available budget or supplier order.

Opportunity score

Not available

No score available for this project.

FROM THE COUNCIL RECORD

Recorded scope

Specific Engineering Design for the remediation of the existing bridge, which includes reinstatement of pile diagonal bracing, repla cement of wing walls walls, new timber blocking between existing br

This is the recorded consent work. It does not establish current construction or an open supply package.

Other recorded consent context

Auckland Council records building consent activity under building consent reference BCO10418102. The retained September source describes the work as: Specific Engineering Design for the remediation of the existing bridge, which includes reinstatement of pile diagonal bracing, repla cement of wing walls walls, new timber blocking between existing br. The source records the consent as issued on 2026-09-24. The source-reported consent value is NZ$ 130,000.00. The source-reported floor area is 22 square metres. This record does not establish current construction stage, procurement status or remaining budget.

Relevance for materials suppliers

The council record describes Specific Engineering Design for the remediation of the existing bridge, which includes reinstatement of pile diagonal bracing, repla cement of wing walls walls, new timber blocking between existing br. Use the recorded scope to assess whether the work fits the products you supply.

Confirm the current drawings and whether relevant suppliers have already been chosen.

The score is a research-priority signal. It does not confirm current work, an open supply package, a buyer or purchase intent.

Key facts

Source location
Manukau Auckland reporting area
Consent reference
BCO10418102
Source activity
Specific Engineering Design for the remediation of the existing bridge, which includes reinstatement of pile diagonal bracing, repla cement of wing walls walls, new timber blocking between existing br
Source record ID
auckland-monthly-issued:BCO10418102
Source-reported value
NZ$130,000

The source date records a council event; it does not show when construction began.

Values and areas are reported by the source. They are not a verified current budget or a measure of available work.

What to confirm

  • This record describes a council event. It does not tell us whether the work is under way, who is managing it, or whether suppliers have been chosen.

Project contacts

This page does not name a project contact or buyer.

Use the consent reference and date to ask the council records team about later updates. The council is a source contact, not the project buyer.

NEXT STEP

Questions suggested by the recorded work

Use consent auckland-monthly-issued:BCO10418102 to locate later council records. Ask: Which parts of this recorded work remain active, what specifications apply, and who handles supplier enquiries?

Confirm the scope, current involvement and supplier appointments before assessing remaining work.

Check the council source →

Check the council record

Auckland Council monthly building-consent spreadsheet, September 2026

Consent reference
BCO10418102
Building consent issued
2026-09-24

Use this reference and date to ask the council records team about later amendments or decisions. We have not confirmed whether the individual record or attachments are publicly available.

Council website (not the individual record) ↗

OVERIQO prepared this summary from council information; it is not endorsed by Auckland Council.

How to interpret these records →